3D Slab, Footing, Pier & Stair Takeoff

Concrete Calculator

Multiply length × width × depth (in feet) and divide by 27 for cubic yards. A 10×10 ft slab at 4 inches thick requires 1.36 cubic yards (62 bags of 80-lb concrete with 10% subgrade waste).

Interactive 3D takeoff for slabs, strip footings, poured walls, round pads, Sonotube piers, post holes, hollow tubes, stairs, curb & gutter, and CMU block fill under ASTM C94 & ACI 318 standards.

Advertisement

Live 3D Concrete Takeoff
1.36 yd³(62 bags 80lb)• 36.67 ft³
Details
Slab · 1.36 yd³ · 34°
3D Concrete Slab / Patio (ASTM C94): 1.36 yd³ (36.67 ft³) • 62 bags (80lb) • 3,500–4,000 PSI
Slab
4" Patio/Walkway • 5"–6" Driveway/Garage • 8" Heavy Pad

Concrete Takeoff

Order Quantity (w/ +10% Waste)
1.36 yd³(36.67 cu ft)
Metric1.04 m³
Net Volume: 33.33 ft³•Wet Weight: 2.66 tons (5,318 lbs)

80-lb Bags

62

2 pallets

60-lb Bags

82

0.45 ft³/bag

40-lb Bags

123

0.30 ft³/bag

#4 Rebar (20' Bars)

8 sticks (150 LF)

Gravel Base (4")

1.9 tons (1.36 yd³)

Ready-Mix Truck vs. Bagged CostTruck saves ~$37
Ready-Mix Truck (+$140 short load)$350.8
80-lb Bags (62 × $6.25)$387.5

On-Site 1:2:3 Scratch Mix Ingredients

Portland (94lb)10 bags
Concrete Sand0.95 tons
Coarse Gravel1.4 tons

Confirm product yields, unit core volumes, supplier pack sizes and local prices before ordering. Reinforcement quantities are material allowances; laps, hooks, embedment and engineered design are excluded.

Advertisement

Direct Answer: Concrete Yards, Bags & Coverage Multipliers

ASTM C94 benchmarks for rapid jobsite conversion between cubic yards, cubic feet, and pre-mixed bags:

Concrete Yardage and Bag Multipliers Direct Answer Table
Concrete Unit / TargetEquivalent Cubic Feet80 lb Pre-Mix Bags60 lb Pre-Mix Bags4" Slab Coverage
1 Cubic Yard (yd³)27 cu ft (0.765 m³)45 bags (Net) / 50 w/ 10%60 bags (Net) / 66 w/ 10%81 sq ft
1/2 Cubic Yard13.5 cu ft23 bags (Net) / 25 w/ 10%30 bags (Net)40.5 sq ft
1 Bag (80 lb)0.60 cu ft1 bag1.33 bags1.8 sq ft
1 Bag (60 lb)0.45 cu ft0.75 bag1 bag1.35 sq ft

Formulas for All 10 Concrete Shapes

Every 3D geometry in the calculator above uses exact solid mensuration formulas before applying your selected subgrade waste factor:

Engineering Formulas and Benchmarks for 10 Concrete Shapes
Concrete ShapeCubic Feet Formula (ft³)Field Example (+10% Waste)
1. Slab / PatioL(ft) × W(ft) × [Thick(in) ÷ 12]10'×10'×4" = 1.36 yd³ (62 bags 80lb)
2. Strip FootingL(ft) × [W(in) ÷ 12] × [Depth(in) ÷ 12]60'×16"×8" = 2.18 yd³ (98 bags 80lb)
3. Solid Poured WallL(ft) × H(ft) × [Thick(in) ÷ 12]20'×8'×8" = 4.35 yd³ (196 bags 80lb)
4. Round Circular Slabπ × [Dia(ft) ÷ 2]² × [Thick(in) ÷ 12]12' Dia × 4" = 1.54 yd³ (70 bags 80lb)
5. Column / Sonotube Pierπ × [Dia(in) ÷ 24]² × H(ft) × Qty6 piers (12" × 4') = 0.77 yd³ (35 bags)
6. Post Holes (Net)(Hole Cylinder ft³ − Submerged Post ft³) × Qty8 holes (10"×3' w/ 4×4) = 0.45 yd³ (21 bags)
7. Hollow Circular Tubeπ × [(OD ÷ 24)² − (ID ÷ 24)²] × H(ft)36" OD × 24" ID × 4' = 0.64 yd³ (29 bags)
8. Solid Stairs / Steps[(N(N+1)÷2) × Rise × Run + TotalRise × Plat] × W4 steps (4' W + 36" landing) = 1.07 yd³
9. Curb & Gutter[((CurbH+FlagT)×CurbW + GutterW×FlagT) ÷ 144] × LF60 LF (6"×6" curb + 18" pan) = 3.06 yd³
10. CMU Block Core FillBlocks × CoreVol(0.16–0.35 ft³) × FillFraction150 blocks (8" solid fill) = 1.35 yd³ (61 bags)

Common Slab Sizes & Concrete Yardage

Common Slab Sizes and Concrete Yardage Reference
Project Slab SizeArea (sq ft)4" Slab (Cu Yds w/ 10%)6" Slab (Cu Yds w/ 10%)80lb Bags (4" Slab)
10' × 10' Patio1001.36 yd³2.04 yd³62 bags
12' × 12' Shed Base1441.96 yd³2.93 yd³89 bags
12' × 20' 1-Car Driveway2403.26 yd³4.89 yd³147 bags
20' × 20' 2-Car Garage4005.43 yd³8.15 yd³245 bags
24' × 24' Workshop Slab5767.82 yd³11.73 yd³352 bags

How to Calculate Concrete Slabs, Footings, Columns & Stairs

Accurate concrete takeoffs combine three-dimensional geometry with field allowances for subgrade undulation, form deflection, and reinforcement placement:

1

Convert Inches to Decimal Feet

Divide any inch measurements (slab thickness, footing width, or column diameter) by 12 before multiplying by length in feet (4 inches = 0.333 ft; 6 inches = 0.50 ft).

2

Compute Net Cubic Feet

Use the shape-specific formula—such as L × W × T for slabs, π × r² × H for round piers, or wedge summation for stairs—and subtract submerged post displacement.

3

Divide by 27 for Cubic Yards

One cubic yard equals a 3 ft × 3 ft × 3 ft cube (27 cubic feet). Divide your total cubic feet by 27 to get net cubic yards.

4

Add 10% Subgrade & Spillage Buffer

Excavated trenches, gravel subbases, and auger holes rarely match exact nominal dimensions. A 10% waste buffer prevents costly short loads mid-pour.

5

Size Rebar Grid & Crushed Stone Base

Add #4 Grade 60 rebar on 18-inch centers (or 6×6 welded wire mesh) supported on chairs at mid-depth, over 4 to 6 inches of compacted #57 stone or crusher run.

6

Compare Ready-Mix Truck vs. Bags

For pours above 1.5 to 2.0 cubic yards (~70 to 90 bags of 80lb mix), transit mixer delivery typically costs less than bagged mix and ensures monolithic strength.

Concrete Placement & Curing Best Practices

  • Compacted Subbase: Never pour concrete over organic topsoil or loose fill. Compact 4 inches of crushed aggregate (ASTM D2940) to prevent slab settlement and cracking.
  • Control Joint Spacing: Tool or saw-cut control joints to 1/4 of the slab depth at intervals equal to 24 to 30 times the slab thickness in inches (e.g., 8 to 10 feet apart for a 4-inch slab).
  • Moisture Curing: Keep newly placed concrete damp or sealed with ASTM C309 curing compound for at least 7 days to achieve target 28-day compressive strength.
  • Cold & Hot Weather Protection: Do not pour concrete when freezing temperatures (< 40°F) are expected within 48 hours without ACI 306 insulated curing blankets.

Ready-Mix Truck vs. Bagged Concrete Pricing Planning

As an illustrative planning example, delivered ready-mix concrete typically averages $135 to $165 per cubic yard for standard 3,000–3,500 psi residential mix, with short-load delivery fees ($100 to $180) often assessed on orders under 5 or 6 cubic yards. An 80 lb pre-mix bag typically costs $5.50 to $7.00 at home improvement centers (yielding 0.60 cu ft, or ~$247 to $315 per cubic yard in bag form). Professional flatwork labor generally adds $6.00 to $12.00 per square foot for forming, placing, and finishing. Always obtain a dated quote from local suppliers for exact regional pricing.

Calculation Assumptions & References Planning Reference

Material estimates depend on the selected dimensions, product yields, and waste allowance.

Content date: March 2026
Related references: ASTM C94 (Ready-Mix), ACI 318 (Structural Concrete), ASTM C33 (Aggregates), IRC Section R402. Confirm the applicable edition and local requirements.
A material estimate is not a structural design or code approval.
Masonry Q&A

Concrete Calculator & Bag FAQ

Verified answers on bag-to-yard conversions, post-hole displacement, stair math, and slab thickness standards.

One cubic yard contains exactly 27 cubic feet. A single standard 80lb bag of pre-mixed concrete yields approximately 0.60 cubic feet of wet mixed concrete. Therefore, you require 45 bags of 80lb concrete to equal one net cubic yard (or 50 bags including a 10% subgrade waste buffer; 60 net bags for 60lb concrete).

Advertisement