IBC Section 713 & ASME A17.1 Hoistway Standard

Elevator Shaft CMU Calculator

A 3-story elevator hoistway (40-ft perimeter, 36-ft total height) requires 1,701 standard CMU blocks, 90 bond beam units, 5.95 cubic yards of core grout, and 120 linear feet of firestop sealant to achieve a 2-hour rating.

Calculate CMU block quantities, inter-story bond beam courses, structural core grout, perimeter smoke firestopping, and internal scaffolding lifts for multi-story elevator hoistways and enclosed stair towers.

Standard Multi-Story Shaft Presets
Shaft Materials
1,701 CMU• 5.95 cu yd grout
Details

Shaft Geometry & Dimensions

Total outer wall perimeter (e.g. 10' × 10' hoistway = 40 ft)

Number of building levels enclosed by the shaft

Average floor-to-floor structural height

8" CMU meets IBC 2-hr shaft rating; 12" provides 3 to 4-hr rating

Structural & Fire Rating Baseline
Total Height36 ft
Gross Wall Area1,440 sq ft
IBC Fire Rating2-Hour

CMU estimates use nominal face dimensions and illustrative mortar yields (30 standard 8-inch units per 80-lb premix bag before waste; thickness adjustments apply). Confirm product yields, unit core volumes, supplier pack sizes and local prices before ordering. Reinforcement quantities are material allowances; laps, hooks, embedment and engineered design are excluded.

Shaft Material Takeoff

Total Concrete Masonry Units (5% Waste)

1,701blocks
Approx. 16 Pallets (108 units/pallet)

Covers 1,440 sq ft wall envelope for 3 stories (36 ft total height)

Shaft Enclosure Components

Bond Beam U-Blocks
93 unitsInter-story ring beams (3 levels)
Core Grout Volume
5.95 cu ydsReinforced cells & bond beams
Firestop Smoke Sealant
120 linear ftPerimeter joint & floor slab seals
Scaffolding Lifts
6 lifts6-ft vertical interior towers
Shaft Fire Rating:2-Hour (IBC 713.4)
Elevator Rail Anchors:ASME A17.1 Guide Rail Embeds
Firestop Smoke Barrier:ASTM E814 / UL 1479 Compliant
Structural Masonry Code:TMS 402/602 & IBC Chapter 21

IBC Table 722.3.2 Concrete Masonry Fire-Resistance Ratings

International Building Code (IBC) Section 713 mandates fire-resistance ratings for shaft enclosures based on the number of building stories connected. Concrete masonry units (CMU) deliver non-combustible passive fire protection without requiring fragile internal drywall linings:

IBC Table 722.3.2 Minimum Equivalent Thickness for Fire-Resistance Ratings of CMU
Aggregate Type1-Hour Rating2-Hour Rating3-Hour Rating4-Hour RatingNominal 8" CMU Baseline
Calcareous Gravel2.8" eq. thick4.2" eq. thick5.3" eq. thick6.2" eq. thick2-Hr (Grouted cells qualify for 3–4 Hr)
Siliceous Gravel3.0" eq. thick4.5" eq. thick5.7" eq. thick6.7" eq. thick2-Hr Rating with 1-hr grout cores
Limestone / Cinders2.7" eq. thick4.0" eq. thick5.0" eq. thick5.9" eq. thick2-Hr Rating Standard (Meets < 4 Stories)
Expanded Clay, Shale, or Slate2.6" eq. thick3.6" eq. thick4.4" eq. thick5.1" eq. thick3-Hr Rating Standard (Hollow 8" CMU)
Expanded Slag or Pumice2.1" eq. thick3.2" eq. thick4.0" eq. thick4.7" eq. thick4-Hr Rating Exceeded (Hollow 8" CMU)

Note: Equivalent thickness equals the net volume of the CMU unit divided by its face length and height. Solid-grouted cores achieve 100% equivalent thickness (7.625" for 8" CMU; 11.625" for 12" CMU), qualifying for 4-hour fire ratings under all aggregate classifications.

ASME A17.1 Guide Rail Anchorage & Dynamic Loading

Elevator hoistway walls perform dual duty as structural shear enclosures and precision guidance envelopes. Elevator car guide rails and counterweight rails transfer intense dynamic forces into the concrete masonry walls during car braking, safety wedge engagement, and seismic shaking:

Rail Bracket Anchor Embeds

Per ASME A17.1 Section 2.23, guide rails must be anchored at vertical intervals not exceeding 14 to 16 feet. Heavy weld plates (typically 3/8" steel with welded headed studs) or heavy expansion anchors must be embedded into solid-grouted CMU cells. Ungrouted hollow cells cannot withstand elevator car emergency stop impact loads.

Maximum Deflection Tolerances

Under full elevator cab operating and seismic loads, hoistway wall out-of-plane lateral deflection must be limited to L/600 or a maximum of 1/8 inch (3 mm). Excessive flexure causes rail misalignment, car roller guide binding, or tripping of emergency overspeed governors.

Piston Surge & Piston Pressures

High-speed elevator cabs traveling in tight enclosures act as pistons, generating cyclical positive aerodynamic pressure ahead of the cab and negative suction behind it. Concrete masonry blocks resist cyclic air fatigue far better than light-gauge metal stud shaftliner boards.

Rough Hoistway Door Opening Lintels

Each floor landing requires rough masonry door openings (typically 4'–0" to 4'–6" wide by 7'–6" high). Openings must be spanned by engineered precast reinforced lintels or continuously grouted U-block lintels with 8-inch minimum bearing length on solid jamb cells.

Shaft Masonry Specification & Code Compliance Matrix

Shaft Masonry Specification and Code Compliance Matrix
Shaft Wall ComponentGoverning StandardMasonry SpecificationStructural Purpose
Inter-Story Bond BeamsTMS 402 / IBC 2108Continuous 8" or 12" U-block with 2 #5 Gr 60 barsFloor diaphragm tie-in and lateral load distribution
Rail Bracket Attachment CellsASME A17.1 Rule 2.23Solid grouted cells (f'g ≥ 2,000 psi) with embed platesResists car guide shoe braking and seismic pull-out
Floor Slab Perimeter JointASTM E814 / UL 1479Listed elastomeric firestop caulk & mineral woolPrevents smoke and flame migration between floors
Rough Entrance LintelsTMS 602 / IBC 2104Grouted lintel block or precast masonry beamGravity support over elevator landing door frames
Machine Room Overrun CapASME A17.1 Rule 2.4Solid grouted top course with 3/4" anchor boltsAnchors overhead machine beams and deflector sheaves

Worked Calculation: 3-Story Commercial Elevator Hoistway Takeoff

Consider a standard passenger traction elevator shaft enclosure serving a 3-story office building. The shaft measures 10'–0" × 10'–0" out-to-out (40-ft perimeter) with a 12'–0" floor-to-floor height, yielding a 36-foot total shaft height from pit floor to machine roof deck:

Step 1: Gross Wall Area

Gross Area = Shaft Perimeter × Total Shaft Height
Gross Area = 40 ft × 36 ft = 1,440 sq ft.

Step 2: CMU Block Quantity

Standard 8" CMU requires 1.125 blocks per sq ft.
Net Blocks = 1,440 × 1.125 = 1,620 blocks.
With 5% cutting waste: 1,701 CMU blocks (~16 pallets at 108/pal).

Step 3: Bond Beam U-Blocks

Bond beam courses at each story diaphragm tie-in:
Units per ring beam = 40 ft / 1.33 ft = 31 blocks/floor.
Total for 3 stories = 3 × 31 = 93 bond beam units (approx. 90–93 units).

Step 4: Structural Core Grout

Grout volume for reinforced jambs, bond beams, and rail cells:
Grout Volume = 1,701 blocks × 0.0035 cu yd/block = 5.95 cubic yards.

Step 5: Firestop Joint Sealant

Perimeter fire and smoke sealant at floor slab interfaces:
Linear Footage = 40 ft perimeter × 3 floors = 120 linear feet of listed firestop caulk.

Step 6: Internal Scaffolding Stages

Vertical scaffolding erected inside confined shaft space:
Tower Lifts = 36 ft total height / 6 ft lift height = 6 scaffolding lifts.

Confined-Space Shaft Erection & OSHA 1926.451 Standards

Masonry hoistways present unique construction logistics because masons work inside narrow vertical shafts with limited overhead clearance and heavy structural loading:

Tower Scaffolding Systems

Climbing platform mast towers or modular sectional pipe scaffolding must be designed to withstand heavy pallet loads (up to 3,000 lbs of CMU and mortar tubs) with guardrails and toe-boards on all open sides per OSHA 1926.451(b).

Cleanout Openings & High-Lift Grout

When grouting vertical reinforced cells in pours exceeding 5 feet, cleanout holes must be provided at the base of each vertical bar per TMS 602 Section 3.2. Debris and mortar droppings must be washed out before sealing cleanouts and placing high-lift grout.

Acoustic Isolation (STC 55+)

Concrete masonry provides superior sound transmission loss (STC 50 to 55+), dampening elevator motor drive hum, relay clicking, and high-velocity wind buffeting from transmitting into adjacent residential units or executive suites.

Structural & Elevator Engineering Advisory

This takeoff tool provides material estimations for architectural planning and masonry bidding. Elevator hoistways require site-specific structural design sealed by a registered Professional Engineer (PE/SE) and coordination with the elevator equipment manufacturer (OEM) to verify rail bracket spacing, pit impact buffer forces, machine beam reaction loads, and locally adopted building and fire codes.

Calculation Assumptions & References Planning Reference

Material estimates depend on the selected dimensions, product yields, and waste allowance.

Content date: October 2026
Related references: IBC Section 713 (Shaft Enclosures) & Chapter 21 (Masonry), ASME A17.1 / CSA B44 Safety Code for Elevators and Escalators, TMS 402/602 Building Code Requirements and Specification for Masonry Structures, ASTM C90 (Standard Specification for Loadbearing Concrete Masonry Units), ASTM E814 / UL 1479 (Fire Tests of Penetration Firestop Systems), OSHA 1926.451 (Safety Standards for Scaffolds Used in Construction). Confirm the applicable edition and local requirements.
A material estimate is not a structural design or code approval.
Masonry Q&A

Elevator Hoistway & Stair Shaft CMU FAQ

Authoritative answers on fire-resistance ratings, guide rail bracket anchorage, smoke firestopping, and masonry shaft construction standards.

Under IBC Section 713.4, shaft enclosures connecting four stories or more must have a minimum 2-hour fire-resistance rating. Shaft enclosures connecting less than four stories require a minimum 1-hour fire-resistance rating. Standard 8-inch concrete masonry units (CMU) manufactured with expanded shale, slate, or slag aggregates provide an inherent 2-hour to 4-hour fire rating per IBC Table 722.3.2, eliminating the need for applied gypsum shaftwall systems.

Advertisement

Popular Quick Estimates

Illustrative takeoffs with stated assumptions; verify project quantities

Specialized tools for foundation, core fill, and budgeting

Blogs & Construction Guides

Practical guides to block sizing, material estimates and project planning